What you can do
- Automatic re-scheduling — edit any task, dependency, calendar, or resource and the entire plan re-solves instantly
- Live critical path — the zero-slack chain is always visible on the Gantt chart
- Resource leveling — overloaded resources are leveled away using each task's slack
- Built for scale — virtualized rendering and off-main-thread solving keep 10,000-task plans smooth
Measured star growth
- in 24h
- 0
- in 7 days
- 0
- in 15 days
- Update delayed
- in 1 month
- Update delayed
Net star changes over overlapping periods, not daily totals. Missing measurements are left blank. Stars measure attention, not software quality.
About
browser-based project scheduling tool built around dependency-driven scheduling
ProductivityREADME.md
OriginalPlanit
Live demo: https://zgm4z.github.io/planit/
Planit is a browser-based project scheduling tool built around dependency-driven scheduling. Change any task, dependency, calendar, or resource and the whole plan re-solves automatically — the critical path stays highlighted, resource overloads are leveled away, and every action is undoable. Everything runs and is stored in your browser: no server, no account.
Status: early preview. Planit is under active, rapid development — APIs, data formats, and behaviour may change without notice, and stability is not guaranteed yet.
Highlights
- Automatic re-scheduling — edit any task, dependency, calendar, or resource and the entire plan re-solves instantly
- Live critical path — the zero-slack chain is always visible on the Gantt chart
- Resource leveling — overloaded resources are leveled away using each task's slack
- Built for scale — virtualized rendering and off-main-thread solving keep 10,000-task plans smooth
- One plan, four views — Gantt, outline, calendar, and resource, plus a task/project inspector
- Full undo/redo — one drag is one undo step; nothing is half-applied
- Local-first — autosaved in your browser, no server and no sign-up
- Trilingual UI — 中文 / English / 日本語, switchable at any time
Features
Tasks & Scheduling
- Task tree — summary tasks, subtasks, and milestones in a single structure; summary dates roll up bottom-up, and a task's kind (leaf vs. group) is derived from its structure, so inconsistent data cannot arise.
- Two scheduling modes
- Automatic — the planner solves from dependencies and constraints; each task can carry a paired start/end constraint (start / finish, no earlier than / no later than).
- Manual — the interval is pinned and never moved by dependencies or leveling; conflicts that run into a manual task are surfaced rather than silently absorbed.
- ASAP / ALAP placement within each task's feasible window; the project can be scheduled forward from the start date or backward from a deadline.
- Drag to schedule — drag a bar to move it, drag either handle to change the start or the duration; drop points snap to workdays, and a dragged task becomes manually scheduled.
- Milestones — zero-duration points that can carry dependencies and be delayed by leveling.
Dependencies
- Four dependency types — finish-to-start, start-to-start, finish-to-finish, and start-to-finish — drawn directly from a bar's endpoints on the Gantt chart.
- Lag in three units — workdays, elapsed days (spanning weekends and holidays), or a percentage of the predecessor's duration; all may be negative as lead time.
- Cycles are rejected the moment they would be created.
- Dependencies that cannot be honored are listed as conflicts instead of being silently reconciled.
Automatic Scheduling & Critical Path
- A full critical path method (CPM) solve: forward pass (early dates), backward pass (late dates), total slack, and free slack.
- Change anything, everything re-solves — durations, dependencies, constraints, calendars, and assignments all trigger a re-solve.
- Live critical path — the zero-slack chain is highlighted on the Gantt chart.
- Conflicts are collected in a dedicated list, with how far off a schedule is where relevant.
- The solve runs on a Web Worker, so even a 10,000-task plan stays responsive while recomputing; the outline and Gantt render through virtualized scrolling.
Working Calendars
- Every project carries a configurable calendar — weekday selection plus holiday exceptions on any date.
- Exceptions can be added or removed per day or per range, and a range reverts as a single step.
- A monthly calendar view colors workdays, non-workdays, and exceptions; click a date to toggle it.
- Resources can attach their own calendar or fall back to the project default.
- Changing the calendar re-solves the whole project.
Resources & Effort
- Four resource kinds — staff, equipment, material, and group (groups nest).
- Per resource: availability (for example 50% for part-time), efficiency, an available period (hire date / lease window), and cost (per-use plus an hourly rate).
- Assignments from either side — "who works on this task" from the task panel, or "which tasks this person is on" from the resource panel: the same record, the same commands.
- Two effort models — fixed duration (adding a person adds effort and keeps the duration) and fixed effort (adding a person actually shortens the task).
- Derived totals for every task and resource: uses, hours, and cost.
Resource Leveling
- When a resource is over-allocated on a day, the planner pushes tasks forward within their slack until the load fits or the slack runs out.
- Priority decides who yields — higher-priority tasks keep the resource first, and pinned tasks (manual scheduling / constraints) never move.
- Overloads that cannot be resolved are reported precisely: which resource, which day, and at what load.
- The resource timeline highlights overloads, so double-bookings are visible at a glance.
- Leveling is a single command and can be undone.
Baselines & Earned Value
- Multiple baseline snapshots — capture the plan at any time, keep as many as you like, and switch the active comparison baseline freely.
- Schedule variance — each task shows its baseline start/finish against the current schedule, in workdays.
- Earned value — BAC, EV, PV, and SV are derived from cost and progress.
- Set a status date together with an active baseline to unlock PV and SV.
Monte Carlo Simulation
- Risk analysis — run Monte Carlo simulations to model project duration uncertainty based on optimistic, most-likely, and pessimistic task estimates.
- PERT Beta distribution — each task's uncertainty is sampled from a Beta-PERT distribution, reflecting real-world asymmetric risk.
- Visual analytics — interactive dashboard with histogram, key statistics (mean, median, P10/P50/P90), and confidence intervals.
- Non-blocking execution — simulations run in a Web Worker, keeping the UI responsive even during thousands of iterations.
- Configurable — adjust iteration count and confidence level to balance accuracy and computation time.
Views
- Gantt — task bars, dependency lines with correct endpoint semantics for all four types, critical-path highlighting, non-workday shading, and drag scheduling.
- Outline — the task tree as a table with a configurable column set (start, finish, slack, assigned, cost, variance, and more), draggable column widths, and persisted preferences.
- Calendar and resource views complete a four-way view switcher.
- A two-tab inspector (task / project) gathers task info, scheduling, constraints, dependencies, assignments, baselines, and earned value.
Data, Undo & Language
- Command model — every change goes through a registered command; the UI dispatches, it never writes data directly.
- Full undo/redo — forward and inverse patches are generated automatically, and one drag is one undo step.
- Autosave — debounced persistence to browser storage; refresh and nothing is lost, and older saves keep opening as the schema evolves.
- Trilingual UI — 中文 / English / 日本語, with every string translated, including undo messages.
Tech Stack
React 19 · TypeScript · Vite · Mantine 9 · SCSS Modules · react-i18next · Zustand · Immer · @tanstack/react-virtual · date-fns
Getting Started
pnpm install
pnpm dev # start the dev server (port 5174)
pnpm build # production build
pnpm test # unit tests
pnpm typecheck # type check
License
GNU Affero General Public License v3.0, version 3 only (AGPL-3.0-only).
Planit is free software: you may use, modify, and redistribute it, including for commercial purposes, as long as you comply with the following.
- Derivative works must stay open source. Anything you convey must be licensed under the AGPL-3.0 as well, with the original copyright and license notices retained.
- Network use counts as distribution. If you run a modified version as a network service, users who interact with it over a network must be offered the corresponding source code (AGPL section 13).
- No trademark rights are granted. The name "Planit" and its logo remain the trademarks of zhuoguangming and may not be used without permission.
- No warranty. The software comes as is, without any warranty.